Saturday, 7 March 2015

Production Log

Week 7 


This week me and my group have been continuing to edit our music video, so far we are at 2 minutes and the music video is coming along well and we are on schedule because when we edit we take our time because we want our video to be good and we ask the teachers to watch it or sometimes our classmates and they give us positive feedback and from there we make the change meant. also we showed Mrs Lowndes because we needed to show it and she said that it was good but we should try to change some scenes so it can be in sync with the video and also we may need to re film some of the lip-syncing because some matches but then some doesn't. Me and Darren take it turns to edit because it would be a fair and because Omar is good, with music he is in charge of cutting to the beat, so whenever he presses the space bar that's when me or Darren depending on who is editing will cut to the beat also in our group we try to switch some scenes to see if it will work and some do work well. We had some problems with some of the scenes because we made the scenes longer when we could of shorten them down. So next week when we edit we will shorten the scenes because then it will give the video a flow and we will experiment with the scenes to see what will work.



No comments:

Post a Comment